Client: Public House Management Group

Scope: Design and construction of an indoor & outdoor function space.

Size: $2.5M

Construction Services
Project Management
Custom Joinery
Interior and Exterior Detailing

DETAILS

2023

COMPLETED

Referred to as The Tocky Terrace, this project involved a first-level extension to the rear of the Toxteth Hotel. Works included structural demolition, piling works above the Glebe light rail tunnel, a new grease trap, and kitchen exhaust. Following the enabling work, structural works commenced for the new terrace, which included structural steel, concrete slabs, and extensive fire rating. Fit-out works consisted of electrical, security, dry fire, mechanical, hydraulic services, as well as lightweight partitioning, aluminium windows, tiled floor finishes, joinery, and a retractable roof.

SUMMARY

Referred to as The Tocky Terrace, this project involved a first-level extension to the rear of the Toxteth Hotel. Works included structural demolition, piling works above the Glebe light rail tunnel, a new grease trap, and kitchen exhaust. Following the enabling work, structural works commenced for the new terrace, which included structural steel, concrete slabs, and extensive fire rating. Fit-out works consisted of electrical, security, dry fire, mechanical, hydraulic services, as well as lightweight partitioning, aluminium windows, tiled floor finishes, joinery, and a retractable roof.